New Year is coming, many owners and friends will also be ready to decorate the new house. Today, the decoration home network Xiaobian collects the detailed process of building decoration for everyone, so that the majority of our users are not busy with the renovation, no longer being pitted, let us now Let's see it together!
First, the analysis of 21 links in the whole process of building decoration
(1) Pre-design
One of the things that must be done in the early design is to make a detailed measurement of your room. The main contents of the measurement include:
1. Identify the area involved in the renovation process. Especially the tile area, wall paint area, wallpaper area, floor area;
2. Identify the main wall dimensions. In particular, it is necessary to design the wall size of the furniture in the future. By the way, please remind everyone that before starting work, don't forget to go to the property to complete the construction procedures and pay the decoration deposit.
(2) Demolition of the main body
Entering the construction stage, the main body demolition is the first project, mainly including demolition, wall building, shovel wall skin, plastic steel window and so on. The main body of the demolition is white, that is, the framework of the construction site is first put together.
(3) Hydropower transformation
Before the water circuit was rebuilt, the main structure demolition should be basically completed. The first measurement of the cabinet should also be carried out between the hydropower transformation and the main body demolition. In fact, the so-called cabinet measurement did not have any actual content. Because the wall and the ground were not treated, the cabinet designer could not give the specific design size, but only the water outlet and the hood socket reserved by the developer. Location, make some relevant suggestions. mainly include:
1. See if the position of the hood socket affects the installation of the hood later;
2. See if the position of the water meter is appropriate;
3. Check if the position of the water inlet is convenient for installing the sink later.
After the completion of the waterway renovation, it is best to do the waterproofing of the bathroom. The kitchen generally does not need to be waterproof.
Some owners have always thought that some materials should be advanced before the renovation. What I want to say is that unless it is the main material needed for the main body to be demolished, the entry time of the main materials such as ceramic tiles and large core plates should be after the hydropower transformation. Because the circuit transformation involves the ground slotting, if the position of the tile and the large core board is improper, it is very troublesome for the workers to move in and move out.
(4) Woodworking
Woodworking, bricklayers, and oilers are the "three brothers" in the construction process. The basic order of appearance is: wood - tile - oil. The basic principle of appearance is - who is dirty and who is first. "Whoever gets dirty first" is also one of the basic principles that determine the order of home improvement, which I will mention later.
In fact, woodworking activities such as bag riser, decorative ceiling, plaster line can also be considered as a detailed part of the main body demolition. It does not conflict with the water circuit transformation. Sometimes it needs some Coordination, such as I mentioned before - "If you are going to make a fake wall at home, you should consider whether there are hydropower lines on the fake wall. If there is, you should let the hydropower reform workers pre-bury the pipe."
(5) tiling
If the workers are too busy to open, the foreman will usually let the "Woodworker" enter the tiling when the "woodworking boss" is not over yet. This is normal because there is no conflict between the two.
In the process of “Washer Buddyâ€, the following three links are also involved:
1. Installation of door stone and marble window sill. The installation of the stone can be done with the paving slabs. After the paving slabs, the installation of the marble sills is usually done after the window sills are completed. The marble workers will prepare the glass glue and seal the marble and window coverings with glass glue. It is.
2. Installation of floor drains. The floor drain is the first in the home improvement hardware because it is to be installed together with the floor tiles. Therefore, when students start building materials, they should buy floor drains early.
The above is a detailed answer to the renovation of the building, I do not know if you are satisfied with the introduction of the decoration home network Xiaobian. If you want to know more about the exciting content, please continue to pay attention to our decoration encyclopedia!
More related wonderful reading:
What are the renovation processes? How long can the renovation be completed?
How to decorate the rough room? Rough house renovation process
What should I pay attention to in the second renovation? Secondary renovation process considerations
What is the renovation process? What precautions?
Considerations for the house renovation process Reasonable arrangement for the house renovation process
hidden faucet,bathroom shower faucet,Modern shower faucet
Jiangmen Faer Sanitary Co.,Ltd , https://www.faersanitarys.com