In the second renovation of the house, the reconstruction of the ceiling and the ground is also one of the most important projects. Especially those who used to spend money on the shape and the floor can keep it?

Most of the original ceiling was demolished

In the second decoration, the original ceiling ceiling decoration should be dismantled, such as: lamp pool, modeling ceiling, plaster line, hanging mirror line, grille, and plastic buckle plate and aluminum buckle plate ceiling of kitchen and bathroom; At the time of design, designers generally also advise customers to remove the original ceiling. The main reason is that the original ceiling shape and the style and surface decoration material embodied are out of date; in addition to the aging of materials, it is no longer possible to continue the transformation and construction on the basis of the original ceiling. Therefore, the demolition is necessary from the viewpoint of safety and material life.

Demolition considerations

1. When the original ceiling decoration is dismantled, care should be taken to remove it as much as possible, without retaining the original ceiling decoration structure. In particular, structures such as suspenders and pendants in the original ceiling that carry the weight of the suspended ceiling must be dismantled. This is mainly due to future safety considerations.

2. The power supply should be cut off first, and the original ceiling circuit lines should be removed as much as possible. Do not consider continuing to use the circuit because the circuit in the original ceiling has almost no use value.

3. The safety of the equipment and facilities in the original ceiling shall be taken into account when demolition. Many old houses in the last century have heating pipes in their ceilings, and some houses are central air-conditioning systems, to avoid damage to pipelines and equipment due to disassembly. .

4. To avoid damage to ventilation ducts and flue ducts when removing the original ceiling from the kitchen and bathroom.

Redesign security first

Unlike the new house, the design of the second reformed house should give priority to the safety of the suspended ceiling. In particular, some old homes with a useful life of more than 15 years have experienced aging of their original building structures. In addition, due to the requirements of hanging structures during the construction of the original ceilings, many holes were drilled on the top surface, which reduced the local carrying capacity.

Second, the ceiling reconstruction should pay attention to the impact of indoor light sources. Multi-level, multi-functional lighting is an important part of enriching the art of ceiling decoration and facilitating life. The height of the ceiling should be moderate, it will change the natural lighting of the room, and affect the decoration of the wall, especially the soft decoration in the future.

The echo relationship between the ceiling and the ground must also be taken into account. The division of some living functions is based on the ground. When the ground function and the ceiling are asymmetric, it will affect the placement of furniture and other furnishings in the future. When severe, it will affect the function of future life. Realize the impact.


Renovation of the ground according to local conditions

Bricks are recommended to be completely dismantled

Whether or not the original floor tiles should be removed depends on the conditions of use. If the original floor tile has been partially damaged, more empty or detached, the surface enamel has worn, or if it is seriously dirty, it must be removed and replaced. Simple repair is generally not effective. If only considering the replacement of a few tiles, it is more difficult, because after many years it is almost impossible to match the tiles with the same color, type and style.

Of course, if it is to save or save money, it can be replaced when the floor tiles are basically intact, but it is necessary to eradicate and rework all the floor tiles during the renovation period. Because there are a lot of bacteria or dirt in the tiles that have been used for a long time, they must be removed, and they will look better when re-stitched. Under normal circumstances, we recommend that you remove the kitchen and bathroom floor tiles during the renovation.

Wooden floor can be reserved

If the original floor is solid wood and it is kept well, it may be possible to dismantle the loose parts without reinforcement or adjustment. But generally do not consider repainting on the original floor, because when the new paint is repainted and paint brand and paint on the original floor do not match, there will be a chemical reaction, will damage the paint, serious will stain the floor Plates, causing the floor not to be used. If paint remover is used to remove the original paint and repaint it, the construction cost is relatively high. Even the cost of artificial paint and paint remover will reach more than 120 yuan per square meter, and it is difficult to maintain the original appearance of the floor. Hand brushing also makes it difficult to guarantee the quality and effectiveness of the paint.

If the original floor is a composite floor, if the service life is less than five years and there is no serious wear, you can continue to use it, but check the integrity of the floor and whether it is loose. It should be noted that if you want to make a partial repair or replacement, the colors, textures, and surface finishes of newly-purchased flooring are very different from those of floors that have been used for several years. The other is if local replacement or repair must look for professional manufacturers, do not give decoration construction team to do it.

Qijia warm tips

Can the floor be directly laid on the floor tile?

This is theoretically feasible, but it should be noted that the floor tiles must be thoroughly cleaned, and then disinfected before paving the floor, otherwise the floor will become a breeding ground for bacteria and microorganisms. Unfavorable health. There is also the floor tile floor must be intact and there must be no empty drums or floor tiles to fall off. In addition, because the floor is directly laid on the floor tiles, increasing the ground height difference will have a direct impact on the height of the door, and will affect the ground level difference with other different functional areas, which must be taken into consideration.

How to make up for kitchen height difference

In the old houses of the last century, many toilets were equipped with squatting pans. The entrance was a high table and it was inconvenient. If the toilet is replaced, the original high bricked platform should be dismantled. When dismantling, it must be taken care not to damage the original water outlet pipe and the seal of the pipe root, otherwise it will cause the installation or leakage of water downstairs. For example, if the floor of the kitchen and toilet should be slightly lower than the other functional areas after the renovation, a transition stone can be used to pass the stone. The passstone should be at least higher than the kitchen floor.

Ceiling installation Flooring Ceramic tile Lacquer decoration Interior decoration Housing Central air-conditioning Decoration style Floor tile Kitchen ceiling grille Lights Bathroom door Bathroom ceiling material Bathroom ceiling Bathroom design Bathroom floor tile Bathroom leak

Case Hydraulic Parts

Hydraulic Piston Pump, Duplex Pump, Short-Stroke Pump, Noise/Vibration Reduction, High Self-Priming Ability, Rotational Stability, High Efficiency, High Pressure, Compact Size, Reduction of Overall Length.

We export GENUINE PUMP, OEM PUMP, AFTERMARKET PUMP. We are specialized in OEM PUMP & AFTERMARKET PUMP. We export 95 NATIONS. Please contact us If you need STABLE SUPPLIER.Case hydraulic pumps for the machine models listed below are available ex stock or with a short delivery.

Case Hydraulic Main Pump,Case Main Hydraulic Pump,Case Hydraulic Pump,Case Hydraulic Pump Spare Parts,Case Hydraulic Main Pump Assembly,Case Main Pump,Case Pump,Case Hydraulic Parts,Case Excavator Parts

Jining Juheng Hydraulic Machinery Co., Ltd. , https://www.juheng-cn.com