On October 10, the National Audit Office released the announcement of the results of the audit of No. 38 this year, and announced the results of the rectification of the audit reports on energy conservation and emission reduction of enterprises in 20 provinces. From October 2009 to September 2010, the Audit Commission applied to Hebei, Shanxi, Inner Mongolia, Liaoning, Jilin, Heilongjiang, Jiangsu, Zhejiang, Anhui, Fujian, Shandong, Henan, Hubei, Hunan, Guangdong, Guangxi, Chongqing, Sichuan, Guizhou. The audit investigation on energy conservation and emission reduction of power, steel and cement industries in 20 provinces, autonomous regions and municipalities in Shaanxi Province from 2007 to 2009 found that the management of special funds for energy conservation and emission reduction in some localities and enterprises was not standardized, and the construction of high energy consumption was illegal. The problems of high-pollution projects have not been completely eliminated, and the elimination of backward production capacity is not complete enough. Recently, the National Audit Office conducted a follow-up investigation on the rectification of relevant localities and enterprises. According to the follow-up survey, by the end of July this year, the competent departments of local governments in 20 provinces have urged 11 enterprises to return all the funds of 0.57 billion yuan that were occupied and misappropriated to the reduction channels; the funds of 26 enterprises were more than 144 million yuan. Recovered; 5 provincial special accounts store differential electricity price income of 369 million yuan, and 4 provinces deducted power generation enterprises with more than 167 million yuan of desulfurization electricity price, and according to regulations, the power generation enterprises that meet the standards enjoy the desulfurization electricity price of 2.12 billion yuan. In response to the problems found in the audit investigation, as of the end of July this year, the relevant local authorities have urged 49 enterprises to improve or improve the approval procedures for the 9.39 million kilowatts installed capacity thermal power project, shut down or dismantle the small thermal power unit 492,500 kilowatts; urged 182 enterprises to adopt Equal elimination, improvement of approval procedures, etc., to correct illegal construction of ironmaking capacity of 50.860 million tons, steelmaking capacity of 6,138,700 tons, steel rolling capacity of 4.37 million tons, elimination of backward ironmaking capacity of 16.739 million tons, steelmaking capacity of 14.152 million tons; 85 enterprises stopped construction, suspend production and rectification or improve the examination and approval procedures, involving cement production capacity of 39.05 million tons, eliminated or included in the plan to eliminate backward cement production capacity of 7,721,500 tons; Hubei, Shandong and other nine provinces have handled 105 responsible personnel according to law. In addition, the Development and Reform Commission, the Ministry of Finance, the Ministry of Industry and Information Technology, the Ministry of Environmental Protection, the Ministry of Housing and Urban-Rural Development, and the Ministry of Land and Resources have conducted in-depth analysis of the issues revealed by the audit investigation from the institutional, institutional, and institutional levels, and improved and improved. Strengthen relevant policies and regulations such as prevention and control of sludge pollution in urban sewage treatment plants, support for the development of biodiesel, and elimination of backward production capacity.
Outdoor Lighting,Led Chandelier,Outside Lights,Outdoor String Lights
Foshan Nanhai Pinming Electrical Appliance Co.,Ltd , https://www.mavcadonf.com